Washington, 2009

An Electrical Utility Contractor retained the services of SWP Environmental to assist with the environmental regulations on a new 20 mile, 230-kV double-circuit, steel lattice transmission line from Olympia Substation to Shelton Substation.  The project passes through varied terrain and required large cut and fills to create construction work plans.   

SWP was responsible for implementing the Stormwater Pollution Prevention Plan, providing an onsite Certified Erosion and Sediment Control Lead (CESCL) for monitoring and inspecting duties along with designing site-specific erosion and sediment control plans.